Construction Updates

< >
#4 Green
#4 Green

#4 Green - Setting elevations for putting surface and surround. 07.14.14

#4 Green
#4 Green

#4 Green - After sand has been installed. 09.06.14

#4 Green
#4 Green

#4 Green - Surround and rough grass growing in. 09.26.14

#5 Green
#5 Green

#5 Green - Installing internal drainage. 07.30.14

#5 Green
#5 Green

#5 Green - Sand installed and graded. 08.19.14

#6 Green
#6 Green

#6 Green - The edge with drive out path. 08.15.14

#6 Green
#6 Green

#6 Green - Sand layered over completed drainage. 08.15.14

#14 Green
#14 Green

#14 Green - Ready for seed. 09.19.14

#15 Green
#15 Green

#15 Green - Preparing ground. 10.03.14

#15 Green
#15 Green

#15 Green - Shaping the green. Note on right, one of the transplanted white pines from our nursery. 10.03.14

#15 Green
#15 Green

#15 Green - After seed. 10.07.14

#12 Green Site
#12 Green Site

#12 Green Site - Elevations for green surface set. 06.07.15

#12 Fairway
#12 Fairway

#12 Fairway - Discced. 06.07.15

# 12 Tee - Seed Growing In. 09.26.15

# 13 Fairway - Seed Growing In. 10.01.15

# 10 Green
# 10 Green

# 10 Green - Being Built. 10.03.15

# 11
# 11

# 11 Fairway - Removing Trees. 10.23.15